header


Rete Autostrade Mediterranee (RAM)

  • Initiative 6.4: Analysis of the Italian Customs systems and adoption of Directive 65/2010 in Italian ports

    • Pilot action proposed:

    Report and analysis of the Italian Customs systems and adoption of Directive 65/2010

    • Stakeholders involved:

    RAM S.p.a.
    Italian Customs agency
    Italian Coast Guard
    Italian Ministry of Infrastructures and Transports

    • Subject matter: What?  

    In order to apply the 2 directives related to the define the Single Window and Port Community Systems according to the EU directives It will be analyzed in straight collaboration with the institutional bodies in charge for the definition of the criteria, will be elaborated a technical report that contain the procedures to be followed to integrate the 2 systems.

    • Purpose: Why?  

    At the moment are still under definition the procedures to be followed to implement the 2 systems, in particular it is necessary identify possible ways to integrate these two procedures.

    • Location: Where?  

    Italy

    • Sequence: When?  

    Prototyping: 2013
    Testing/Piloting: 2014-2015

    • People: Who?  

    Italian Customs
    Italian Coast Guard
    Participation of at least 2 ports (one on Adriatic side and on Tyrrhenian side)

    • Method: How?  

    To reach the goal, it will be necessary set up a permanent table at institutional level that will allow knowing exactly the current situation. The possible approach to be followed is:

    Report and analysis of the Italian Customs systems
    - National overview
    - Customs procedures at local and central level
    - Technical data sheet of the ports identified (at least 2)
    - Local focus / best practices

    Report and analysis of the adoption of directive 65/2010
    - Definition of a Port Community System
    - Current state of art at national level
    - Technical data sheet of the ports identified (at least 2)
    - Local focus/ best practices

    Identification of possible ways to integrate the 2 systems

    Recommendation and time plan

    • Cost: How much?  

    To be evaluated in a later phase.